Manpower supply in Saudi Arabia (supplying skilled and unskilled workers to contractors, plants and service companies) is a licensed activity. Labour supply and outsourcing may only be done by establishments licensed by the Ministry of Human Resources and Social Development (MHRSD). Ministerial Resolution 60339 (25 October 2025, in force from 26 January 2026) regulates outsourcing of non-Saudi workers through Ajeer. It separates service outsourcing from labour outsourcing, requires both parties to have a valid CR and activity licence and to comply with wage protection, requires an electronic contract on Ajeer, and caps each permit at 3 years. Manpower is usually billed monthly per worker or per hour from client-approved timesheets. LUBA ERP handles workers, deployment, timesheets, invoices and pay sheets in one system.
Talk to our team in Al Jubail on WhatsApp or call +966 54 961 1338. Arabic and English.
Manpower supply in Saudi Arabia in 60 seconds
| Question | Answer |
|---|---|
| Is a licence needed? | Yes. Labour supply / outsourcing only through MHRSD-licensed establishments |
| Main platform | Ajeer (on Qiwa) for outsourcing non-Saudi workers to another establishment |
| Latest rules | Ministerial Resolution 60339, in force from 26 January 2026 |
| Contract | Electronic service contract documented on Ajeer |
| Permit length | Up to 3 years, or the contract end if sooner |
| Who employs the worker? | The provider stays the legal employer; the client supervises on site |
| How it’s billed | Monthly per worker or hourly from approved timesheets, plus overtime |
| Common trades | Helpers, scaffolders, welders, fitters, electricians, riggers, drivers, cleaners, safety officers |
The 2026 Ajeer outsourcing rules (Resolution 60339)
Law-firm summaries of the resolution describe these rules:
| Topic | Rule |
|---|---|
| Two types | Service outsourcing: project-based, output-driven. Labour outsourcing: workers placed under the client’s supervision |
| Eligibility | Provider and client need a valid CR and activity licence |
| Compliance | Both must comply with wage protection, establishment file and labour documentation rules |
| Profession | The worker must do the same profession as on their work permit |
| Contract | An electronic service contract issued and documented on Ajeer, approved through the platform |
| Duration | Ajeer permit up to 3 years, or earlier if the contract ends; renewals need new approval |
| Provider’s duty | Remains the legal employer: work permits, iqamas, renewals and labour law |
| Client’s duty | Supervision, on-site compliance, and stopping work when the permit expires |
Not allowed:
- using a worker before the Ajeer permit is issued;
- giving tasks outside the approved profession or contract scope;
- using a permit for an entity other than the named client;
- keeping the worker on site after the permit expires or is cancelled.
For clients: check the provider’s MHRSD licence before signing and during the contract. Advisory summaries of the related licensing resolution say payments should not be released to unlicensed providers.
How manpower supply rates and billing work
| Model | How it’s billed | Typical use |
|---|---|---|
| Monthly per worker | Fixed monthly rate per trade (for example a set number of hours, Friday off) | Long-term site and plant support |
| Hourly | Hours worked × hourly rate per trade | Shutdowns, turnarounds, peaks |
| Overtime | Hours above normal at an agreed rate | Most site work |
| Lump-sum service | A fixed price for a defined output | Service outsourcing |
What usually goes in the rate: salary, GOSI, iqama and work permit costs, medical insurance, accommodation, transport, food allowance, PPE, Saudization costs and margin.
The monthly cycle: the client approves the timesheet (normal hours, overtime, absences), then you invoice from it, attach the timesheet, and pay your workers from the same hours.
Documents clients ask manpower suppliers for
- CR with the manpower or outsourcing activity, and the MHRSD licence
- Ajeer contract and permits for each worker
- Worker list: iqama number, profession, nationality, iqama and medical expiry
- GOSI certificate and Saudization (Nitaqat) certificate (GOSI guide, Qiwa guide)
- Mudad / WPS compliance (Mudad guide)
- Trade certificates: welders, riggers, scaffolders, electricians; third-party certificates for critical trades
- Medical fitness, safety induction and site access cards
- Insurance and HSE documents
Supplying manpower to Aramco, SABIC and industrial plants
- Many plants only accept workers from registered suppliers, or through registered main contractors. See our Aramco, SABIC, Marafiq and Royal Commission guides.
- Workers need site inductions, gate passes and often trade tests or third-party certification.
- Shutdowns and turnarounds in Jubail, Ras Tanura and Yanbu create big short-term demand for skilled trades.
- IKTVA and Saudization targets favour suppliers with more Saudi employees.
Starting a manpower supply company in Saudi Arabia
- Company: CR with the correct activity (MISA first if foreign-owned).
- MHRSD licence for manpower supply / outsourcing.
- Qiwa, GOSI, Muqeem and Mudad: establishment files, work permits, iqamas and WPS.
- Nitaqat: build your Saudization band, because a low band blocks visas and transfers.
- Ajeer: document every client contract and worker permit.
- ZATCA: VAT and e-invoicing for monthly invoices (ZATCA rules).
- Vendor registration with plants and main contractors (all guides).
- Software for workers, timesheets, invoicing and pay.
Run manpower supply with LUBA ERP
LUBA ERP, made in Al Jubail, has a full manpower supply module:
- Workers with iqama number, trade, skills, crew and rates
- Client manpower requests and deployment lists
- Monthly timesheets with overtime, sick and absent days, filled in one click or imported from Excel
- Client approval steps, then a ZATCA tax invoice from the timesheet, with the timesheet PDF attached
- Worker pay sheet and bank file from the same hours, plus employees, salaries and GOSI
- Manpower margin report by worker, trade and project
See LUBA ERP manpower supply software or book a demo.
How Luba helps
We help manpower companies set up and grow: CR, MISA, Qiwa, GOSI, Muqeem and Mudad, Saudization planning, vendor registration with Aramco, SABIC and industrial plants, and LUBA ERP for timesheets and invoicing. We also support companies looking for manpower through our workforce solutions.
Sources
- Legal500 / Al Tamimi – New MHRSD rules on outsourcing non-Saudi labour through Ajeer (Resolution 60339)
- HRSD – Amendments to Labor Law articles (PDF)
- Incorporated – Saudi staff outsourcing now licence-only
Talk to our team in Al Jubail on WhatsApp or call +966 54 961 1338. Arabic and English.
Frequently asked questions
Do I need a licence to supply manpower in Saudi Arabia?
Yes. The Labor Law amendments say no one may recruit or subcontract workers without an MHRSD licence, and manpower supply and outsourcing are limited to MHRSD-licensed establishments.
What is Ajeer?
Ajeer is the MHRSD program on Qiwa that documents the temporary outsourcing of a non-Saudi worker from their employer to another establishment, without transferring sponsorship.
What changed for manpower outsourcing in 2026?
Ministerial Resolution 60339, in force from 26 January 2026, separates service and labour outsourcing, requires valid CRs and licences for both parties, wage protection compliance, an electronic contract on Ajeer, and caps permits at three years.
How long can an Ajeer permit last?
Up to three years, or until the service contract ends if that is sooner. Renewals need new approval on the platform.
Who is the employer of an outsourced worker?
The provider remains the legal employer and handles work permits, iqamas and labour law duties. The client supervises the work on site.
How is manpower supply billed in Saudi Arabia?
Usually monthly per worker or hourly per trade, plus overtime, based on a timesheet approved by the client, with 15% VAT on a ZATCA e-invoice.
What documents do clients ask manpower suppliers for?
CR and MHRSD licence, Ajeer contracts and permits, worker list with iqama details, GOSI and Saudization certificates, WPS compliance, trade certificates, medical and insurance documents.
Can a manpower company supply workers to Aramco sites?
Usually through Aramco vendor registration or a registered main contractor, with site inductions, gate passes and trade certifications for the workers.
What software do manpower supply companies use in Saudi Arabia?
They need worker records, deployment, monthly timesheets with overtime, client approval, invoicing from timesheets and pay sheets. LUBA ERP includes all of these in Arabic and English.
